Click here to make tpub.com your Home Page

Page Title: Install
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5420-279-23
b.
Install
(1)
Fit the telescopic tube (1) to the far bank support.
(2)
Fit the lower pin (14) and locking plate (11).
(3)
Apply thread-locking compound to the screws (13).
(4)
Secure the locking plate (11) with the washers (12) and screws (13).
(5)
Fit the upper pin (10) and locking plate (7).
(6)
Apply thread-locking compound to the screws (8).
(7)
Secure the locking plate (7) with the washers (9) and screws (8).
(8)
Fit the micro-bore pipes to the telescopic tube (1) in the positions noted during removal.
(9)
Bleed the far bank support system in accordance with unit maintenance procedure 5-075.
c.
Follow on task
(1)
Check the operation of the far bank support in accordance with the operator's manual TM
5-5420-279-10.
5-243

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business