|
|
TM 5-5420-279-23
b.
Install
(1)
Fit the telescopic tube (1) to the far bank support.
(2)
Fit the lower pin (14) and locking plate (11).
(3)
Apply thread-locking compound to the screws (13).
(4)
Secure the locking plate (11) with the washers (12) and screws (13).
(5)
Fit the upper pin (10) and locking plate (7).
(6)
Apply thread-locking compound to the screws (8).
(7)
Secure the locking plate (7) with the washers (9) and screws (8).
(8)
Fit the micro-bore pipes to the telescopic tube (1) in the positions noted during removal.
(9)
Bleed the far bank support system in accordance with unit maintenance procedure 5-075.
c.
Follow on task
(1)
Check the operation of the far bank support in accordance with the operator's manual TM
5-5420-279-10.
5-243
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |