|
|
TM 5-5420-279-23
(3)
Fit the front panel (2) to the electrical enclosure assembly (1) with the 16 screws and
washers (3).
(4)
Position the electrical enclosure assembly (1) on the launch frame aligning the mounting
brackets.
(5)
Apply thread-locking compound to the mounting bolts.
(6)
Secure the electrical enclosure assembly (1) on the launch frame with the mounting bolts
and washers.
(7)
Fit the ground cables connected to the electrical enclosure assembly (1).
(8)
Fit the electrical harnesses in the positions noted during removal.
c.
Follow on tasks
(1)
Switch the battery shutoff switch to the on position.
(2)
Carry out a functional test of the electrical enclosure assembly (1) by deploying the
launcher and operating the launch beam drive and winches. Refer to the operator's manual
TM 5-5420-279-10.
5-181
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |