Click here to make tpub.com your Home Page

Page Title: Remove
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5420-279-23
8
9
10
7
a.
Remove
(1)
De-pressurize the hydraulic system. See unit maintenance procedure 5-118.
(2)
Remove launch beam drive cover. See unit maintenance procedure 5-035.
(3)
Remove launch beam drive rear guard see operator's maintenance TM 5-5420-279-10
chapter 10.
(4)
Release rear pinch roller pressure.
(5)
Remove the drive chain (9). See unit maintenance procedure 5-037.
(6)
Note the position of and remove the hydraulic pipes connected to the motor (7).
(7)
Note the position of and remove the pipe connected to the back of the brake unit (10).
(8)
Remove the four nuts (1), bolts (6), flat washers (3), lock washers (2), shim pack (5) and
packer (4), securing the motor and gearbox assembly to the launch beam drive. Discard
the lock washers (2).
(9)
Remove the motor and gearbox assembly to a suitable working surface.
(10)
Drain the gearbox oil. See unit maintenance procedure 5-038.
(11)
Remove and retain the ring of bolts (11) attaching the motor (7) to the gearbox (8).
(12)
If the gearbox is being replaced it will be necessary to remove the drive sprocket. See unit
maintenance procedure 5-040.
(13)
Check the hydraulic pipes for damage.
(14)
Check the drive sprocket for damage.
(15)
Check the motor and gearbox body casing for damage.
(16)
Check all threaded components for damage.
5-143

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business