|
|
TM 5-5420-279-23
a.
Remove
(1)
Remove the left hand launch frame guard access cover, to gain access to the pinch
roll/stowing manifold.
NOTE
The pinch roller ball valve must be operated to release residual hydraulic pressure acting
on the rear pinch roller.
(2)
Turn the rear pinch roller ball valve lever through 90 degrees. See Appendix F page 19
figure 9.
(3)
Remove the launch beam pins (1) from the launch beam pin storage rack (2).
(4)
Remove the four bolts (3) and lock washers (4) securing the launch beam pin storage rack
(2) to the launch frame, then remove the launch beam pin storage rack (2).
NOTE
An empty launch beam pin storage rack (2) can be lifted by one person.
5-129
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |