Click here to make tpub.com your Home Page

Page Title: Follow on tasks
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5420-279-23
NOTE
The stop track (2) complete with items (3, 4, 5 and 10) is fitted with slide block (4) located
behind the slide pads (20 and 24) on the A-Frame stabilizer leg assembly.
(16)
Refer to the slide block assembly illustration.
(17)
Apply thread locking compound to the screws (25 and 26).
(18)
Secure wear pads (20 and 24) to the A-Frame stabilizer leg in the position noted during
removal.
(19)
Fit bumper and spacer (21) to the A-Frame stabilizer leg with lock washers (22) and screws
(23).
(20)
Refer to the handle assembly illustration.
(21)
If removed fit the thread insert (7) to the stop track (2).
(22)
Place the bushing (13), spring (12) and spacer (11) on the A-Frame bracket.
(23)
Feed shaft (1) upward through items (11 through 13).
(24)
Apply thread locking compound to the screws (6)
(25)
Secure shaft (1) to stop track (2) with screws (6).
(26)
Fit spring pin (19) through shaft (1).
(27)
Fit handle (18) complete with items (14, 15 and 17) to shaft (1) and secure in place with
quick release pin (16).
c.
Follow on tasks
(1)
Check the operation of the bridge stop emergency.
5-109

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business