|
|
TM 5-5420-279-23
(4)
Remove the dowel (3).
(5)
Inspect components for damage.
(6)
Change components as required.
b.
Install
(1)
Clean all parts with the cleaning solution.
(2)
Align the dowel (3) shoot bolt hole with the mark on the bridge module (4) made during
removal.
(3)
Fit the dowel (3) to the bridge module (4).
(4)
Fit the location pin (1) down through the bridge module (4) deck.
(5)
Fit the split cotter pin (2) into the location pin (1).
(6)
Apply black CARC paint (5) to the head on the location pin (1).
5-66
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |