|
|
TM 5-5420-279-23
Table 5.11 Launcher Components PMCS - Far Bank Support
Fig No
PROCEDURES
REMARKS
Equipment is not
a. Examine for weld cracks and impact damage.
ready/available for use,
b. Examine the slide pads (A) on the center post (wear
if damage or defects
not to exceed 1mm).
are found while
c. Check the operation and alignment of the shoot bolts
carrying out steps a. to
(B).
j.
d. Check for free movement of the support bearing pads
(C).
e. Check the hydraulic system for leaks.
f. Check the hydraulic fluid level in the reservoir.
g. Examine the hydraulic-micro bore pipes (D) for
damage, and check that their clipping is secure.
h. Check the hydraulic clamp (E) operation.
i. Check the cylinders (F) for scoring and distortion.
j. Check all components for damage to protective paint
film.
5-19
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |