Click here to make tpub.com your Home Page

Page Title: Fig 1.2 Crane
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 5-5420-279-23
k.
The crane incorporates an overload protection shut-off system. In the event of any
overload situation, however caused, the system prevents any further movement of the crane
boom, which will increase the load moment. This system allows movements, which reduce the
load moment and continued operation within the rated capacity of the crane.
l.
An emergency stop button is located at the control position on the crane. In the event of
electrical failure, operation of two valves stops all functions except manual emergency control to
safely recover the load and stow the crane.
m.
For further information on the operation and maintenance of the crane, refer to the
manufacturer's literature supplied.
Fig 1.2 Crane
1-7

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business