Click here to make tpub.com your Home Page

Page Title: Chapter 2. OPERATION
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 11-6625-564-12
CHAPTER 2
OPERATION
Section I. SERVICE UPON RECEIPT OF EQUIPMENT
2-1. Unpacking
from their respective clips on the module extender
mounting tray (MK-731/ARC-5lX). Remove the
a. Packaging Data. All components of the
rigid module extender with a T-wrench from the
maintenance kit are contained in the transit case.
toolkit. Remove the alignment fixtures and the
When packed for shipment, the air vent on the
locking block from the mounting tray by loosening
transit case is opened, and the maintenance kit is
four retaining screws on each.
placed in a moisture-dust-proof barrier bag, 17 by
(7) Remove the radio set simulator mounting
17 by 23 inches. After the free air is removed and
tray from the access door by loosening four
the bag is sealed, the maintenance kit is placed on
retaining screws.
four polystyrene corner blocks that are in the four
(8) Unlock the access door by sliding the two
bottom corners of a tri-ply fiberboard box. Four
slide-lock fasteners. Lift the door.
more corner blocks are then placed on the top four
(9) Remove the technical manuals, cables,
corners of the maintenance kit. The box is then
cable adapters, dummy load (MK-731A/ARC-51X),
closed and taped shut. The box is 19 by 19 by 25
and toolkit from the storage spaces.
inches, the corner blocks are 6 by 6 by 6 inches with
cutouts of 4 by 4 by 4 inches, the total weight is 81
2-2. Checking Unpacked Equipment
pounds, and the volume is 5.2 cubic feet. A
a. Inspect the equipment for damage during
typical-shipping box and its contents are shown in
shipment. If the equipment has been damaged,
b. Removing Contents.
b. Check the equipment against the packing list.
(1) Use a knife to cut the tape on the box. Open
If no packing list accompanies the equipment,
the four flaps.
refer to paragraphs 1-5.1 and 1-6, and report any
(2) Remove the four corner blocks from the top
overages or shortages on DD Form 6.
of the box. Remove the bag and its contents. Tear
c. If the equipment has been used or recon-
the bag away from the maintenance kit.
ditioned, see whether it has been changed by a
(3) Disengage the four twist-lock clamps and
modification work order (MWO). If modified, an
open the transit case.
MWO number will appear on the front panel near
(4) Remove the radio set simulator by loosen-
the nomenclature plate. Check to see whether the
ing four retaining screws.
MWO number and appropriate notations concern-
(5) Remove the test unit by removing four
ing the modification have been annotated in this
redheaded screws.
manual.
(6) Remove the rigid module extender mount-
Note: Current MWO's applicable to the equipment are listed
ing tray by loosening four retaining screws.
in DA Pamphlet 310-4.
Remove the antenna, dummy load, and air pump
Change 3 17

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business