Click here to make tpub.com your Home Page

Page Title: ASE/ACS
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 1-1510-223-MTF
PROCEDURE
TROUBLESHOOTING
REFERENCE
*31.
ASE/ACS - Program and check.
a.
Aircraft # I and # 2 INVERTER switches -
ON.
b.
AUTO PLT POWER switch - ON.
c.
AVIONICS MASTER POWER switch - EXT
PWR.
d.
# 1 and # 2 EFIS POWER switches - ON.
e.
ATT pushbutton selector switches (display
controllers) - Press as required.
f.
# I INV and # 2 INV three phase inverter
control switches (mission control panel) -
RESET, then ON.
g.
BUS CROSS TIE switch - ON/AUTO.
h.
Mode switch A (multifunction display) -
Depress to select UTILITY mode page.
i.
INS mode selector switch (INS mode
selector panel) - STBY.
j.
ASE BIT perform as required. (Ensure ASE
is on before initiating BIT.)
(1) R2 line selection switch - Depress to
select ASE BIT page.
(2) L1 line selection switch - Depress to
select PULSE WARN BIT.  (Initiates
APR-39 BIT.)  Wait for COMPLETE
message to appear next to L1.
(3) L2 line selection switch - Depress to
select CW WARN BIT. (Initiates APR-
44 BIT.)
2-9

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business