Click here to make tpub.com your Home Page

Page Title: Turntable Bearing Inspection Procedures-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TB 9-2320-279-34
a.
With boom angle level, rotate boom (1) and position boom nose (2) to the front of the truck (Refer
to TM 9-2320-279-10).
b.
Install a dial indicator (3) with magnetic base. Plunger (4) of dial indicator (3) must be in line
with the axial centerline of the crane boom (1), with the plunger tip centered as close as possible
under or over the tip of the swing gear tooth (5).
c.
Adjust dial indicator (3) to preload the dial, then zero the dial indicator (3).
d.
Operate boom up control until boom angle is 60 degrees.
e.
Record dial indicator (3) reading.
f.
If reading is equal to or over .065 inches (1.65 mm), institute bearing replacement procedures. If
reading is under .065 inches (1.65 mm), continue the inspection procedure.
g.
If all readings are under .065 inches (1.65 mm), the inspection procedure is complete, return
crane to service.
h.
Level boom angle and rotate boom to the passenger side of the truck. Repeat steps b. through g.
for measurements with boom positioned to both passenger and driver side.
Change 1
2-19

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business