|
|
TB 43-0002-1
m. TOTAL COST OF TRANSPORTATION AND HANDLING. Enter all costs involved in preparing the item for
shipment at point of use and all transportation and handling costs from point of use to designated point of repair.
n. OTHER COSTS. Enter all other costs not included in the above elements.
o. CONDITION SUMMARY. Enter a statement as to the capability of the owning unit and/or supporting unit to repair
the item, or whether it should be evacuated to a depot level facility, or sent to DRMO.
p. PERSON PREFORMING THE DAMAGED ASSESSMENT EVALUATION. Enter the name, grade, phone
number (DSN/Commercial) , and signature of the person performing the damage assessment evaluation.
q. MAINTENANCE OFFICER.
Enter the name, grade, and signature of the supervising officer or authorized
representative.
B-2
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |