(2) Ferry Status.
(a) Inspect at final destination within 10 flight hours or 14 days of arrival.
(b) Those aircraft that have a DD 250 and are at Boeing Helicopters will be inspected prior
to ferry to final destination.
e.
Maintenance Trainers (Category A and B). Comply within 120 days of receipt of this Technical Bulle-
tin.
f.  Component/Parts in Stock at All Levels (Depot and Others) including War Reserves. Upon receipt
of this Technical Bulletin Depot and Materiel Activity Commanders will ensure the material condition tags of
all items in all condition codes listed in paragraphs 6 and 7 shall be annotated to read "CH--47--00--ASAM--04
(TB 1--1520--240--20--122) Horizontal Hinge Pin Records Check Not Complied With".
(1) Wholesale Stock -- Upon receipt of this message, Depot and Materiel Activity Commanders
will ensure all serviceable items (condition codes //A//, //B//, //C//, //D//, and //E//) listed in paragraphs 6 and
7 are placed in condition code //J// and tagged with a suspended tag/label -- Materiel, DD Form 1575/DD Form
1575-1. Do not remove original condition tags. Report compliance with this Technical Bulletin in accordance
with paragraph 14D (1).
(2) Retail Stock -- Upon receipt of this Technical Bulletin, Commanders and Facility Managers
maintaining retail stock at Installation level and below shall contact the supported aviation unit to perform the
procedures required in accordance with paragraphs 8 and 9 on suspect materiel. Dispose of discrepant mate-
riel in accordance with paragraph 10. Report compliance with this Technical Bulletin in accordance with para-
graph 14D. (2).
2.  Task/Inspection Suspense Date. Complete the inspection in accordance with paragraph 8 within the
next 10 flight hours but no later than 9 AUG 00 and report in accordance with paragraph 14B.
3.  Reporting Compliance Suspense Date. Report compliance in accordance with paragraph 14A no lat-
er that 16 AUG 00.
4.
Summary of the Problem.
a.  A horizontal hinge pin failed hardness and tensile strength tests during a routine quality assurance
destructive test. It has been determined that some horizontal hinge pins with serial numbers UW2407 and
prior may not have been properly heat treated. Horizontal hinge pins with these serial numbers are required
to be hardness tested at the next overhaul or no later than 4800 flight hours total time since new (TTSN). The
hardness test will be conducted by the overhaul facility. Horizontal hinge pins that pass the hardness test will
be re-identified with a suffix "A" vibro engraved after the serial number.
b.
For manpower/downtime and funding impacts see paragraph 12.
c.  The purpose of this Technical Bulletin is to require a records check of all horizontal hinge pins. This
check is required to ensure that all horizontal hinge pins with serial numbers UW2407 and prior are sent in
for hardness checks before they reach a TTSN of 4800 flight hours.
5.
End Items to be inspected . All H--47 series aircraft.
6.
Assembly Components to be Inspected.
NOMENCLATURE
PART NUMBER
NATIONAL STOCK NUMBER
HEAD,ROTARY WING, FWD
145R2003-1
HEAD,ROTARY WING, FWD
145R2003-3
HEAD,ROTARY WING, FWD
145R2003-4
HEAD,ROTARY WING, FWD
145R2003-5
HEAD,ROTARY WING, FWD
145R2003-6
2