TB 1--1520--237--20--224
12. Application.
a. Category of Maintenance. Category of maintenance and aircraft downtime will be AVUM for the in-
spection, repair of the wire harness, and removal and installation of the relay panels. Category of mainte-
nance and aircraft downtime will be AVIM for completion of the relay panel operational check.
b. Estimated Time Required.
(1) Estimated time to perform the inspections IAW paragraph 8:
(a) Total of 1 man--hours using 1 persons.
(b) Total of 1 hours of downtime for one end item.
(2) Estimated time to perform the corrections IAW paragraph 9:.
(a) Total of 6 man--hours using 2 persons.
(b) Total of 3 hours of downtime for one end item.
c.
Estimated cost impact to the field:
Nomenclature
Part No./NSN
Qty
Cost Each
Total Cost
Mounting Plates
TC--92
4
$0.22
$0.88
5340--00--728--1389
Lt Hand Relay
70550--02105--057
1
$7677.00
$7677.00
Panel
5945--01--332--9907
Rt Hand Relay
70550--02102--056
1
$10577.00
$10577.00
Panel
5945--01--325--0624
Total cost per aircraft = $18254.88
d. TB/MWOs to be applied prior to or concurrently with this Inspection. N/A.
e. Publications Which Require Change as a Result of This Inspection. N/A
13. References.
a. DA PAM 738--751, 15 Mar 99.
b. TM 1--1520--237--23.
c.
TM 1--1520--237--23P--3.
d. TM 1--1520--204--23--4.
14. Recording and Reporting Requirements.
a. Reporting Compliance Suspense Date (Aircraft). Upon entering requirements of this TB on DA
Form 2408-13-1 on all subject MDS aircraft, forward a priority message, datafax or E-Mail to Commander,
AMCOM, ATTN: AMSAM--SF--A (SOF Compliance Officer), Redstone Arsenal, AL 35898--5000, IAW AR
95--1. Datafax number is DSN 897--2111 or commercial (256) 313--2111. E-Mail address is "SAFE-
ADM@REDSTONE.ARMY.MIL". The report will cite TB 1--1520--237--20--224, date of entry in DA Form
2408--13--1, the aircraft mission design series and serial numbers of aircraft in numerical order.
b. Task/Inspection Reporting Suspense Date (Aircraft). Upon completion of inspection, commanders
will forward a priority message to the Logistical POC listed in para 16b. The report will cite TB
1--1520--237--20--224, date of inspection, aircraft serial number, aircraft hours, and results of the inspection.
Inspection report will be completed NLT 18 September 2000.
c.
Reporting Message Receipt (Spares). N/A
d. Task/Inspection Reporting Suspense Date (Spares). N/A
5
|