|
|
TB 1-1520-237-20-202
c. Bulk and Consumable Material. N/A.
d. Disposition. N/A.
e. Disposition of Hazardous Material. N/A.
11. Special Tools, Jigs and Fixtures Required. N/A.
12. Application.
a. Category of Maintenance. AVUM.
b. Estimated Time Required for Inspection.
(1) Total of 1/2 man-hours using one person.
(2) Total of 0 hours downtime for one end item.
c. Estimated cost impact of stock fund items to the field. N/A
d. TB/MWOs to be applies prior to or concurrently with this inspection. N/A
N/A
e. Publications Which Require Change as a Result of This Inspection.
13. References.
a. TM 1-1520-237-23.
b. TM 1-1520-250-23.
c. UH-60-97-ASAM-09.
14. Recording and Reporting Requirements.
a. Reporting Compliance Suspense Date (Aircraft). Upon entering requirements of this Technical
Bulletin on DA Form 2408-13-1 on all subject Mission Design Series (MDS) aircraft, forward a priority
message, Datafax or e-mail to Commander, AMCOM, ATTN: AMSAM-SF-A (SOF Compliance Officer),
Redstone Arsenal, Al 35898-5222, per AR 95-3. Datafax Number is DSN 987-2111 or Commercial (205)
313-2111. E-mail address is safeadm@redstone.army.mil. The report will cite this Technical Bulletin
number, date of entry in DA Form 2408-13-1, the aircraft Mission Design Series and serial numbers of
aircraft in numerical order.
b. Task/Inspection Reporting Suspense Date (Aircraft). N/A.
c. Reporting Message Receipt (Spares). N/A.
(1) Material in wholesale depot storage.
(2) Material in retail storage. N/A
d. Task/Inspection Reporting Suspense Date (Spares).
(1) Material in wholesale depot storage. N/A
(2) Material in retail storage. N/A
e. The following forms are applicable and are to be completed in accordance with DA Pam 738-751,
15 Jun 92.
3
|
Privacy Statement - Press Release - Copyright Information. - Contact Us |