Quantcast FRAME 2 - TM-9-2815-210-34-2-20576

 

Click here to make tpub.com your Home Page

Page Title: FRAME 2
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Relief Valve Adjustment. - TM-9-2815-210-34-2-20575
Up
TM-9-2815-210-34-2-2 Engine Assembly Diesel (MULTIFUEL): Naturally Asspirated or Turbocharged Fuel-Injected Water-Cooled 6-Cylider Manual
Next
Flow test. - TM-9-2815-210-34-2-20577
TM 9-2815-210-34-2-2
1.
O p e n adjustable valve (1) and start fuel pump.
K e e p valve (1) open until system is purged of air.
2.
Close valve (1).
3.
T u r n rheostat (2) until voltmeter (3) reads 24 volts. Pressure gage (4)
4.
should read 90 to 100 psi.
T o set pressure, if necessary, loosen check valve locknut (5). Turn relief
5.
v a l v e adjusting screw (6) until pressure gage (4) reads 90 to 100 psi. Hold
r e l i e f valve adjusting screw with screwdriver and tighten check valve locknut.
END OF TASK
4-556

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.