Click here to make tpub.com your Home Page

Page Title: Follow-On Maintenance.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-3
WARNING
Adhesives, solvents, and sealing com-
pounds can burn easily, can give off
harmful vapors, and are harmful to skin
and clothing. Keep away from open fire
and use in a well-ventilated area.  If
adhesive, solvent, or sealing compound
gets  on  skin  or  clothing,  wash
immediately with soap and water. Failure
to  comply  may  result  in  injury  to
personnel.
NOTE
All four controllers are installed the same
way. Boom Up/Down controller shown.
(8) Apply adhesive to seating surface (15).
(9) Connect connector (16) to boom up/down controller (17).
(10) Position boom up/down controller (17) in REMOTE
CONTROL UNIT (2).
(11) Apply adhesive to the first 2 to 5 threads of mounting
studs (18).
(12) Position four self-locking nuts (19) on boom up/down
controller (17).
(13) Tighten four self-locking nuts (19) to 14 lb-in. (2 Nm).
NOTE
Adhesive requires 24 hours to cure.
(14) Spread excess adhesive over heads of four self-locking
nuts (19).
g. Follow-On Maintenance.
Operate crane using REMOTE CONTROL UNIT (TM 9-
2320-366-10-1 or TM 9-2320-366-10-2).
End of Task.
Change 1
7-197

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business