Click here to make tpub.com your Home Page

Page Title: CONTINUITY TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-2
TM
CONTINUITY TEST
(1)
Remove HOIST UP/DOWN controller (para 7-32).
(2)
Set multimeter to ohms.
(3)
Connect positive (+) probe of multimeter on pin
F of remote control box connector.
(4)
Connect negative (-) probe of multimeter on pin
3 of HOIST UP/DOWN controller internal
wiring harness and note reading on
multimeter.
(5)
Position remote control box switch to ON.
(6)
Connect positive (+) probe of multimeter on pin
H of remote control box connector.
(7)
Connect negative (-) probe of multimeter on pin
1 of HOIST UP/DOWN controller internal
wiring harness and note reading on
multimeter.
(8)
If continuity is not present, replace remote
control box internal wiring harness (para 7-32).
(9)
If continuity is present, replace HOIST
UP/DOWN controller (para 7-32).
(10)
Position remote control box switch to OFF.
(11)
Install HOIST UP/DOWN controller (para 7-32).
(12)
Close cover on junction box.
(13)
Tighten four screws on junction box cover.
(14)
Stow crane (TM 9-2320-366-10-1).
2-1313

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business