Click here to make tpub.com your Home Page

Page Title: CONTINUITY TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-2
TM
(1) Loosen four screws on junction box.
(2) Open cover on junction box.
(3) Visually inspect the wiring around terminal
board position 28 for shorted wires that
could put 24 vdc on position 28.
CONTINUITY TEST
(1)
Set multimeter to ohms.
(2)
Connect positive (+) probe of multimeter to
terminal board position 28.
(3)
Connect negative (-) probe of multimeter to
terminal board position 6 and note reading
on multimeter.
(4)
If continuity is not present, replace overload
lockout cable (para 7-27).
(5)
If continuity is present, notify DS Maintenance.
(6)
Close cover on junction box.
(7)
Tighten four screws on junction box.
(8)
Connect batteries (para 7-57).
2-1275

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business