Quantcast CONTINUITY TEST - TM-9-2320-366-20-20397

 

Click here to make tpub.com your Home Page

Page Title: CONTINUITY TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
M1084/M1086 MATERIAL HANDLING CRANE (MHC) OVERLOAD SHUTDOWN SYSTEM DOES NOT ACTIVATE
Up
TM-9-2320-366-20-2 M1083 Series 5-Ton 6 x 6 Medium Tactical Vehicles (MTV) Manual
Next
M1084/M1086 MATERIAL HANDLING CRANE (MHC) OVERLOAD SHUTDOWN SYSTEM STAYS ACTIVATED
TM 9-2320-366-20-2
TM
CONTINUITY TEST
(1)
Loosen four screws on junction box.
(2)
Open cover on junction box.
(3)
Disconnect overload lockout cable
connector from overload shutdown box.
(4)
Set multimeter to ohms.
(5)
Connect positive (+) probe of multimeter in
socket A of overload lockout cable
connector.
(6)
Connect negative (-) probe of multimeter to
terminal board position 6 and note
reading on multimeter.
(7)
If continuity is not present, replace overload
lockout cable (para 7-95).
CONTINUITY TEST
(1)
Set multimeter to ohms.
(2)
Connect positive (+) probe of multimeter in
socket B of overload lockout cable
connector.
(3)
Connect negative (-) probe of multimeter on
terminal board position 28 and note
reading on multimeter.
(4)
If continuity is not present, replace overload
lockout cable (para 7-95).
(5)
If continuity is present, perform Electrical
System Troubleshooting (e116. M1084/M1086
Hoist Up Lockout Does Not Activate, e117.
M1084/M1086 Boom Down Lockout Does
Not Activate, e118. M1084/M1086 Boom Up
Lockout Does Not Activate, and e119.
M1084/M1086 Telescope Out Lockout Does
Not Activate).
(6)
Connect overload lockout cable connector
to overload shutdown box.
(7)
Close cover on junction box.
(8)
Tighten four screws on junction box.
(9)
Connect batteries (para 7-57).
2-1273

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.