TM 9-2320-366-20-2
TM
CONTINUITY TEST
(1)
Remove seven screws and washers from
cover.
(2)
Remove screw, washer, cover, and nut from
WTEC II VIM.
(3)
Remove relay SF04 from WTEC II VIM.
(4)
(5)
Connect positive (+) probe of multimeter to
relay SF04 terminal 30.
(6)
Connect negative (-) probe of multimeter to
relay SF04 terminal 87a and note reading on
multimeter.
(7)
in WTEC II VIM (para 8-6).
CONTINUITY TEST
(1)
(2)
Connect positive (+) probe of multimeter to
relay SF04 terminal 86.
(3)
Connect negative (-) probe of multimeter to
relay SF04 terminal 85 and note reading on
multimeter.
(4)
in WTEC II VIM (para 8-6).
(5)
Install relay SF04 in WTEC II VIM.
(6)
Install cover on WTEC II VIM with nut, washer,
and screw.
(7)
Install seven washers and screws in cover.
2-1079