Click here to make tpub.com your Home Page

Page Title: CONTINUITY TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-2
TM
(1)
Remove six screws from auxiliary panel.
(2)
Lift auxiliary panel from auxiliary panel
housing to gain access.
(3)
Disconnect connector P903 from WINCH
IN/OUT switch.
(4)
Set multimeter to ohms.
(5)
Connect positive (+) probe of multimeter to
WINCH IN/OUT switch terminal 3.
(6)
Connect negative (-) probe of multimeter to
WINCH IN/OUT switch terminal 1.
(7)
Position WINCH IN/OUT switch to in
(TM 9-2320-366-10-1) and note reading on
multimeter.
(8)
If continuity is not present, replace
WINCH IN/OUT switch (para 7-18).
2-991

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business