Click here to make tpub.com your Home Page

Page Title: CONTINUITY TEST
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home
   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-366-20-1
CAUTION
Use care when testing electrical connectors.
Do not damage connector pins or sockets
with multimeter probes. Failure to comply
may result in damage to equipment.
NOTE
Inspect connector pins/sockets for damage,
corrosion, and serviceability. Check that
connector pins are not pushed back and
are capable of making good contact.
CONTINUITY TEST
(1) Disconnect turn signal switch connector
from connector J19.
(2) Set multimeter to ohms.
(3) Connect positive (+) probe of multimeter
to PDP, terminal 30, where relay K10 was
removed.
(4) Connect negative (-) probe of multimeter
to connector J19 socket 6.
(5) If continuity is not present, repair wire
1594 from relay K10 terminal 30 to
connector J19 socket 6 (para 2-45) or
replace WTEC II dashboard cable
assembly (para 7-10) or WTEC III
dashboard cable assembly (para 7-11).
(6) If continuity is present, replace relay K10
(para 7-9).
(7) Connect connector J19 to turn signal
switch connector.
(8) Install instrument panel assembly
(para 7-15).
(9) Install relay K10 in PDP.
(10) Install PDP cover (para 16-2).
Change 1

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business