Quantcast Follow-on Maintenance. - TM-9-2320-279-20-11030

 

Click here to make tpub.com your Home Page

Page Title: Follow-on Maintenance.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Installation-continued - TM-9-2320-279-20-11029
Up
TM-9-2320-279-20-1 5-Ton 6x6 M39 Series Trucks (Multifuel) Manual
Next
NEGATIVE BATTERY CABLES DISCONNECT/CONNECT.
TM 9-2320-279-20-1
Electrical System Maintenance Instructions (Cont)
7-90.
BATTERIES, TERMINALS, AND CABLES REMOVAL/INSTALLATION (CONT).
(9)
Install two negative
terminals (26) with two
screws (27) and nuts (28) on
battery posts (29). Tighten
nuts to 84 to 96 lb-in
(9-11 NSm).
(10)
Install battery box cover (30)
on battery box (2) with
rubber hood hooks (31).
d.
Follow-on Maintenance.
(1)
Start engine to check
operation of batteries
(TM 9-2320-279-10).
(2)
Shut off engine
(TM 9-2320-279-10).
END OF TASK
7-332 Change 4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.