Click here to make tpub.com your Home Page

Page Title: Installation-continued
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TM 9-2320-279-20-1
Electrical System Maintenance Instructions (Cont)
7-90.
BATTERIES, TERMINALS, AND CABLES REMOVAL/INSTALLATION (CONT).
(5)
Install two jumper cable assemblies (8)
on four battery posts (9) with four
screws (10) and nuts (11). Tighten nuts
(11) to 84 to 96 lb-in (9-11 NSm).
CAUTION
While tightening nuts, hold screws with
wrench or damage to battery may occur.
NOTE
STE/ICE wire connects to front battery
terminal. There is only one cable connected
to rear terminal.
(6)
Install three positive battery cables (12)
and STE/ICE wire (13) with two
screws (14), lockwashers (15), and
nuts (16) on terminals (17). Tighten
nuts (16) to 12 to 16 lb-ft. (16-22 NSm).
7-330 Change 4

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business