Quantcast Install - TM-5-5420-279-230811

 

Click here to make tpub.com your Home Page

Page Title: Install
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Remove - TM-5-5420-279-230810
Up
TM-5-5420-279-23 Dry Support Bridge (DSB) (NSN
Next
LAUNCH FRAME - PINCH ROLL/STOW MANIFOLD ASSEMBLY
TM 5-5420-279-23
b.
Install
(1)
Fit the articulator manifold assembly (1) to the launch frame.
(2)
Secure the articulator manifold assembly using the four mounting bolts, nuts and washers
(3).
(3)
Fit the electrical connections (2) in the positions noted during removal.
(4)
Fit the hydraulic connections to the positions noted during removal.
(5)
Check and top up, if necessary, the hydraulic oil level at the hydraulic reservoir.
c.
Follow on tasks
(1)
Switch the battery shutoff switch to the on position.
(2)
Check the operation of the winches.
(3)
Check for hydraulic oil leaks.
6-67

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.