Quantcast Remove - TM-5-5420-279-230560

 

Click here to make tpub.com your Home Page

Page Title: Remove
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
RELAX MECHANISM - BALL JOINT
Up
TM-5-5420-279-23 Dry Support Bridge (DSB) (NSN
Next
ENERGY CHAIN - LINK
TM 5-5420-279-23
3
2
1
4
5
a.
Remove
(1)
Support the weight of the relax mechanism cross member (1).
(2)
Remove the nyloc nut (5), washer (3) and bolt (5) securing the ball joint assembly (11) to
the upper relax mechanism cross member (1). Discard the nyloc nut (5).
(3)
Note the orientation and position of the ball joint assembly (11).
(4)
Remove the four nyloc nuts (9), washers (6 & 8) and bolts (10) securing the ball joint
assembly (11) to the relax mechanism slide housing (7). Discard the nyloc nuts (9).
NOTE
Note the position of and retain the spacers (2) and (12).
b.
Install
(1)
Fit the spacers (2) and (12) to the relax mechanism cross member (1).
(2)
Fit the ball joint assembly (11) in the position noted during removal.
(3)
Fit the bolt (5), washer (3) and new nyloc nut (4) securing the ball joint assembly (11) to the
upper relax mechanism cross member (1).
(4)
Fit the four bolts (10), washers (6 and 8) and new nyloc nuts (9) securing the ball joint
assembly (11) to the relax mechanism slide housing (7).
5-304

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.