Quantcast Service - TM-5-5420-279-230508

 

Click here to make tpub.com your Home Page

Page Title: Service
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
FAR BANK SUPPORT - HYDRAULIC SYSTEM
Up
TM-5-5420-279-23 Dry Support Bridge (DSB) (NSN
Next
Follow on task - TM-5-5420-279-230509
TM 5-5420-279-23
a.
Service
NOTE
There are three sight glasses on the reservoir for checking the hydraulic fluid level.
(1)
Remove the reservoir filler cap (1).
(2)
Using a suction pump, remove the hydraulic oil in the reservoir (2).
(3)
Connect a pump to the hydraulic connection point (5).
(4)
Pump hydraulic fluid into the reservoir (2) until the relevant section of the reservoir is half
full.
(5)
Remove the pump and connect to the hydraulic connection point (3).
(6)
Pump hydraulic fluid into the reservoir (2) until the relevant section of the reservoir is full.
(7)
Remove the pump and connect to the hydraulic connection point (4).
(8)
Repeat step 3.
(9)
Remove the pump and connect to the hydraulic connection point (6).
5-252

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.