Quantcast Remove - TM-5-5420-279-230461

 

Click here to make tpub.com your Home Page

Page Title: Remove
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
LAUNCH BEAM - CARRIAGE STOPS
Up
TM-5-5420-279-23 Dry Support Bridge (DSB) (NSN
Next
LAUNCH BEAM - BUSHING RESILIENT
TM 5-5420-279-23
a.
Remove
(1)
Remove four nyloc nuts (3), washers (4) and bolts (2). Discard the nyloc nuts.
(2)
Remove the stop bracket (1).
(3)
Inspect stop bracket for damage and corrosion.
(4)
Examine bolts for damage to bolt heads and threads.
(5)
Replace components as required.
b.
Install
(1)
Locate stop bracket (1) on forward launch beam.
(2)
Apply thread locking compound to the screw threads.
(3)
Secure stop bracket using four bolts (2), washers (4) and new nyloc nuts (3).
5-205

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.