Quantcast Install - TM-5-5420-279-230421

 

Click here to make tpub.com your Home Page

Page Title: Install
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
LAUNCH FRAME - FRONT ROLLER ASSEMBLY
Up
TM-5-5420-279-23 Dry Support Bridge (DSB) (NSN
Next
LAUNCH FRAME - SIDE ROLLER ASSEMBLY
TM 5-5420-279-23
b.
Install
(1)
Apply thread locking compound to the bolts (12).
(2)
Locate shaft (11) and secure with bolts (12).
(3)
Fit the roller (1) complete with bearing (7), seal (8) washer (6) and retaining ring (5) to the
shaft (11).
(4)
Fit the retainer (3), washer (2) and a new nut (1) to the shaft (11).
(5)
Grease the roller through the grease fitting (10).
5-165

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.