Quantcast Table 5.12 Launcher Components PMCS - Forward and Rear Carriage

 

Click here to make tpub.com your Home Page

Page Title: Table 5.12 Launcher Components PMCS - Forward and Rear Carriage
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Table 5.11 Launcher Components PMCS - Far Bank Support
Up
TM-5-5420-279-23 Dry Support Bridge (DSB) (NSN
Next
Table 5.13 Launcher Components PMCS - Slide Frame
TM 5-5420-279-23
Table 5.12 Launcher Components PMCS - Forward and Rear Carriage
Fig No
PROCEDURES
REMARKS
Equipment is not
a. Examine the rear carriage locking mechanism (A) for
ready/available for use,
damage.
if damage or defects
b. Check the carriage support rollers (B) for signs of
are found while
damage and for freedom to rotate.
carrying out steps a. to
c. Check the top roller rope guides (C) for independent
m.
movement from the outer rollers.
d. Check the side rollers (D) for damage and for freedom
to rotate.
e. Check that the pulley blocks (E) are free to rotate and
that they are not damaged.
f. Check the operation of the shoot bolts (F).
g. Check that the top pulley carrier (G) is free to rotate.
h. Examine the bridge lifting slings (H) for small cuts to
the outer sleeve.
i. Check the security of the sling retaining pins (J).
j. Check the security and free movement of the carriage
latch.
k. Check the security of the winch rope termination pin.
l. Check the frame for damage and cracks.
m. Check all components for damage to protective paint
film.
n. Check carriage rope wear pads.
5-20

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.