Click here to make tpub.com your Home Page

Page Title: Localizing Troubles
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

C2, TM 11-6625-623-45
TROUBLESHOOTING
Section Il.
( 1 ) When making resistance measure-
2-4. Localizing Troubles
ments, disconnect the power cable
a. When to Check. When any of the follow-
from the 115-volt, 400-cps, ac power
ing conditions exist, perform the checks indi-
source.
cated and clear the troubles before returning
(2) Remove the rear cover to reach the
to operation:
inside components. Refer to figures
2-1, 22, and 23 for parts location.
(1) The nature of the abnormal symp-
(3) Set the function test set controls as
toms is not known.
indicated in the tests.
c. Measurements
Chart.  Make the volt-
(2) The abnormal symptoms reported by
age and resistance measurements indicated in
the operator indicate possible refer-
the following chart. If abnormal results are
ence voltage troubles.
obtained, refer to the troubleshooting chart
b. Conditions for Test.
(para 25) for additional isolating procedures.
6

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business