Quantcast Figure 22. Function test set, controls, indicators, and connectors.

 

Click here to make tpub.com your Home Page

Page Title: Figure 22. Function test set, controls, indicators, and connectors.
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

Share on Google+Share on FacebookShare on LinkedInShare on TwitterShare on DiggShare on Stumble Upon
Back
Controls, Indicators, and Connectors
Up
TM-11-6625-623-12 Maintenance Kit Electronic Equipment MK-722/URC Manual
Next
Figure 2-3. Typical bench test setup diagram.
TM 11-6625-623-12
Figure 22. Function test set, controls, indicators, and connectors.
2-5. Preliminary Starting Procedure for
2-4. Bench Test Procedures
Function Test Set
To perform bench troubleshooting of the re-
ceiver-transmitter, perform the preliminary
a. Control Settings. Set the function test set
starting procedures in paragraph 25 and refer
ON-OFF switch to OFF and FUNCTION SE-
LECTOR switch to SET LEVEL.
to TM 11582124835, for operating and
b. Bench Test Connections. Figure 2-3 shows
troubleshooting procedures.

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc.