Click here to make tpub.com your Home Page

Page Title: Determination to Repair, Overhaul or Dispose of Aircraft
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TB 43-0002-3
be conducted with Headquarters, Department of the Army (DALO-SMV) if required. Disposition instructions will be issued
by AMCOM, within 20 working days, of receipt of the memorandum.
4-2.  Determination to Repair, Overhaul or Dispose of Aircraft. The primary factor in deciding if the aircraft will be
repaired, overhauled or disposed of is the maintenance expenditure limits, adjusted by the aircraft system manager to
correctly reflect the current actual value to the Army. Factors such as equipment authorization shortages, operational
requirements, fleet readiness and any changes to actual replacement value will be used in establishing the repair cost
limits.
4-3.  Directed Depot Level Repair or Overhaul. When any aircraft is designated for repair or overhaul at Depot level,
AMCOM will provide all necessary instructions, scheduling, and coordination to ensure the aircraft arrives when
scheduled, and in the proper condition.  When the aircraft is scheduled for a depot level facility, the owning unit is
responsible for informing AMCOM of any problems in the delivery schedule. The owning unit must ensure that the aircraft
is delivered, to include the following:
a.  All items listed on DA Form 2408-17 (Aircraft Inventory Record). Documentation is required for all missing items.
Uninstalled property must be properly packaged to prevent damage, and stowed in or attached to the aircraft to ensure
safe arrival.
b.
All on hand uninstalled Modification Work Order (MWO) kits will accompany the aircraft.
c.
All forms and records will be shipped with the aircraft.
NOTE
Before evacuation of aircraft any classified equipment installed must be removed
and returned to applicable custody or supply per existing regulations.
4-4.  Directed Disposal through the Defense Reutilization and Marketing Office (DRMO). When AMCOM directs an
aircraft to be processed to the DRMO, the following procedures will be complied with:
a.
If a "Save List" is issued by AMCOM, all listed items will be removed and turned-in to the supply.
b.  Components that are listed in TB 1-1500-341-01 or the Unit Level Logistics System - Aviation (ULLS-A)
Component Legitimate Code File, and are not on the "Save List" must be reported as a loss to the inventory per DA PAM
738-751.
7

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business