Click here to make tpub.com your Home Page

Page Title: Supply/Parts (Requisition/Disposition)
Back | Up | Next

Click here for thousands of PDF manuals

Google


Web
www.tpub.com

Home


   
Information Categories
.... Administration
Advancement
Aerographer
Automotive
Aviation
Construction
Diving
Draftsman
Engineering
Electronics
Food and Cooking
Logistics
Math
Medical
Music
Nuclear Fundamentals
Photography
Religion
   
   

 

TB 1-1520-240-20-154
rod end bearing threads for damage. No thread root damage is permitted on the bearing threads. Any damage
requires removal of the instrumented link assembly, per TM 55-1520-240-23-5, Chapter 6 and disposition in
accordance with paragraph 10.d.
g. The inspection is complete when:
(1) All assigned pilots and aircrew are briefed on the requirements of this message.
(2) The CGI is modified in accordance with paragraph 7.c.
(3) The applicable inspections in paragraph 7.f have been performed.
h. Clear the initial entry from paragraph 4.2 and note compliance on DA Form 2408-5-1 (rod end bear-
ing) and DA Form 2408-15.
8.  Procedures/Instructions for Assemblies/Components/Parts In Work or In Stock (at all levels in-
cluding war reserves) -- Annotate the serviceability tag with: "Message CH-47-04-ASAM-02, Transient and
Avoid Bands of the Cruise Guide Indicator, not complied with". Do not remove original condition tags.
9.
Special Tools and Fixtures Required. N/A.
10. Supply/Parts (Requisition/Disposition)
a. Parts Required --
AFT Fix Link, P/N 414C3056-5, NSN 1615-01-117-1135, Qty. 1, Cost ea., $6312.00, Total $6312.00.
Total cost per aircraft = $6312.00
b. Bulk and Consumable Materials -- Tape, Pressure Sensitive Adhesive Red, P/N 1872M,
NSN 7510-00-015-0812.
c.  Requisitioning Instructions -- Requisition replacement parts using normal supply procedures. All req-
uisitions shall use project code (CC 57-59) "X2Q" (X-Ray--Two--Quebec).
NOTE
Project Code "X2Q" is required to track and establish a data base of
Stock Fund expenditures incurred by the field as a result of message
actions.
d. Disposition of discrepant parts/components -- Units will submit a CAT 1 QDR with a tag referencing
this Technical Bulletin, the serial number of the part, and the aircraft serial number. The discrepant parts/com-
ponents shall be held pending disposition instructions from technical point of contact in paragraph 13. If
instructed to dispose of using normal supply precedures, all turn-in documents must include project code
(CC 57-59) "X2Q" (X-Ray-Two-Quebec)
e. Disposition of Hazardous Material -- N/A.
11. Maintenance Application.
a. Category of Maintenance -- AVUM.
NOTE
The time stated below does not include time for maintenance operational
checks, maintenance test flights, or flight crew briefings.
b. Estimated Time Required --
(1) Time to Complete Inspection -- Total of 2--man--hours using 2 persons with 1 hour per end
item.
5

Privacy Statement - Press Release - Copyright Information. - Contact Us

Integrated Publishing, Inc. - A (SDVOSB) Service Disabled Veteran Owned Small Business