TB 1--1520--237-20--239
Inspection Procedures.
a. Inspect the fairing assembly to determine the configuration of the part. There are two configurations
of the tail rotor fairing (part number 70104-11104-044), fiberglass lay-up and injection molded. The fiberglass
lay-up fairing has smooth sides while the injection molded fairing has two raised sections on each side.
NOTE
Supplemental information for this TB can be viewed at: (use lower case letters only) www.reds-
tone.army.mil/sof/suppl/uh60a0201.pdf or www.uhpo.redstone.army.mil
b. If the fiberglass lay-up fairing is installed on all four tail rotor blades, the inspection is complete and
the red horizontal dash / / - / / entry will be cleared.
c.  If an injection molded fairing is installed, inspect the fairing assembly for cracks. The typical crack
occurs in the area where the electrical connector mounting bracket attaches.
(1) If cracks are found, proceed to paragraph 9.a..
(2) If no cracks are found, proceed to paragraph 9.b..
Correction Procedures. .
a. If a cracked injection molded tail rotor fairing assembly is found -
(1) Clear the red horizontal dash / / - / / entry required IAW paragraph 1.a. of this TB.
(2) Enter a new red / / X / / status symbol on the DA Form 2408-13-1with the following statement:
"Tail Rotor Blade (enter the tail rotor blade serial number here) Fairing Assembly Cracked."
Replacement of the fairing will be required prior to the next flight IAW TM 1-1520-237-23-3, paragraph
5-5-17.1, or TM 1-1520-250-23-3, paragraph 5.25.1.
NOTE
The injection molded fairing can be used as a replacement part until a fiberglass part can be ac-
quired.
b. If an injection molded fairing is installed and no cracks are found -
(1) Clear the red horizontal dash / / - / / entry required IAW paragraph 1.a. of this TB.
(2) Enter a new red / / X / / status symbol on the DA Form 2408-13-1with the following statement:
"Replacement of the Fairing Assembly (enter the tail rotor blade serial number here), required IAW
UH-60-02-ASAM-01 (TB 1-1520-237-20-239)." A separate entry is required for each tail rotor blade which
has the injection molded fairing installed.
NOTE
Replacement of the fairing will be accomplished as soon as a fiberglass fairing can be obtained
through supply.
(3) For each injection molded fairing installed, install a Tie Wrap (MS3367-6-0, Boot Tie Wrap)
to secure the de-ice bracket to the tail rotor horn.
NOTE
Supplemental information for this TB can be viewed at: (use lower case letters only) www.reds-
tone.army.mil/sof/suppl/uh60a0201.pdf or www.uhpo.redstone.army.mil
(4) At each 10 hour/14day PMS, conduct a recurring inspection of the fairing in the area where
the electrical connector mounting bracket attaches, for cracks, and the Tie Wrap, for wear and security.
NOTE
ULLS-A units will use a "800" inspection number for the 10 hour/14Day recurring tail rotor blade
fairing assembly inspection.